Work Center In Odoo 13 Manufacturing

 Functional

Work Center In Odoo 13 Manufacturing 

Work Center means organization unit where manufacturing activities or work can be performed. It might be possible that the whole product may or may not be able to be completed using a single Work Center so Manufacturing operations or activity can be done using different Work Centers depending on the type of work which is carried out in each workplace. In this blog we will discuss the Work Center in Odoo 13 Manufacturing. 


Once you have installed a manufacturing module and enable Work Orders to manage Work Centers. 


Go to Configuration →  Settings → Work Orders


Once you enable Work Orders, You can see Work Center like this, 


You can directly go to the Work Center from here or Create New Work Center.


Create a New Work Center and Fill all the relevant details and There are some smart buttons available by which you can simplify the views based on that category.


Alternative work centers : This can be alternate or substitute to this Work Center in order to dispatch the production.


Time Efficiency : This field is for the expected duration of Work Order for this Work Center. For Example, If the Work Order can be completed in one hour and efficiency factor is 100% then this work can be done in one Hour and if efficiency factor is 50% then work is done in 2 Hours. 


Capacity : Number of pieces or work can be produced parallel.


OEE Target : It means Overall Equipment Effectiveness (OEE) Target in percentage.


The time before prod : Time in minutes for some basic setup before start of a production.

Time after prod : Time in minutes for the cleaning once production has been completed 


Description : This is for detailed description about the Work centers.


These are newly added Work Centers, 


Once We started with manufacturing order, You can see the status of Manufacturing orders from here and It is easy to apply color to the Work centers and other settings by clicking on 3 dots which are given on top right corner.


Routing


Once you create WorkCenter and the next step is to create new routing. 


Go to Master Data → Routings 


You can Add a line to define necessary Work Center operations.


  • Give a Suitable name to Operation
  • Easy to choose different work centers in routing a product
  • Define Duration Computation based on Real Time or Set it manually and adjust default duration manually
  • Start Next Operation : Once all products are processed OR Once some products are processed and Save it 



You can upload any file regarding the operations from Work-sheet Tab so it can be either PDF or Google Slide Document 




Also added another operation with a different Work Center and Routings will look like this,



Now, It requires to apply this routing to BOM 


  • Go to Master Data → Bills Of Materials 
  • Select a Product and Set the Routing to Table that we have created.
  • You can change the BOM Type If it is required 
  • Save it 


Manufacturing Order


Now We will create a Manufacturing Order to Make a Table 


  • Go to Operations → Manufacturing Orders
  • Create a New Manufacturing Order 
  • Select Product, Its Quantity, BoM and Save it 
  • Check Availability of Material to see what is available 





Now Click on the Plan button to start plan your order. 




Once Click on Plan Button, It will show Work Orders on the top right corner of the Manufacturing order.




You can Click on the Work Orders to see the status of the orders.




  • Here First Order is Ready and highlighted with Green Color so you can click on that order to complete it. 
  • Once you click on that order you can see the Process button to Start its Operation or You can Pause during production and continue with work later.  
  • Scrap which indicates the product that moves from Current Warehouse to any other 
  • Also easy to create Maintenance Request If it is required




When One work is complete, You can check the Dashboard of the workplace will appear like this.



  • Currently Second Work Place is Showing In process as It is currently in Progress 
  • When both the Works are done and you can mark them Mark As Done to show Finished Work 
  • Here also Productivity analysis is available in OEE of Finished Works





Conclusion :


This blog is part of Manufacturing Of Odoo to provide an idea about how Work Centers work in Odoo. CandidRoot, Odoo Service Provider Company is always ready to help you for Implementation of Odoo MRP for your Manufacturing business by providing various Odoo services like Odoo implementation, Odoo integration, Odoo Customization, and much more.


Comments

  1. You shared an informative and creative article with us. Thanks for sharing. Looking forward for reading more... Wordpress website development

    ReplyDelete

Post a Comment

Popular posts from this blog

Why Choose Odoo ERP Custom Development?

Top 5 Tips To Hire WordPress Development Services

5 Steps To Consider In Android App Development Process | CandidRoot